The 180-day §1942.5 retaliation window starts. Cooperate with the inspector, abate cited violations, document corrections. Avoid adverse action against the tenant in the window unless you can prove a non-retaliatory ground with contemporaneous evidence.
Code complaint = §1942.5 180-day retaliation clock. Cooperate with inspection. Abate cited violations within the window. No adverse action against the complaining tenant without strong contemporaneous non-retaliatory evidence. LA properties: SCEP/REAP escalation if violations linger.
Inspection. Citations. Abatement window.
Not within 180 days without strong contemporaneous non-retaliatory evidence.
Cooperate, abate, document.
Inspector closes file if no violations. Still §1942.5-protected.
Presumed retaliation within 180 days.
Free assessment of abatement plan and retaliation exposure.
Request a free review →